OUR PROJECTS
The proposed mine would be developed on a greenfield site with all infrastructure to be designed and constructed including a rail spur line and loop to achieve the initial planned production of 20 Million Product Tonnes per annum.
Pre-Feasibility and Feasibility Infrastructure Design.
Completed Pre-Feasibility phase and Feasibility Study.
© 2023 Projence. All Rights Reserved.